Home > Terms > Bosnian (BS) > Ključna putanja
Ključna putanja
Generally, but not always, the sequence of schedule activities that determines the duration of the project. Generally, it is the longest path through the project. However, a critical path can end, for example, on a schedule milestone that is in the middle of the project schedule and that has a finish-no-later-than imposed date schedule constraint. See also critical path method.
0
0
Improve it
- Part of Speech: noun
- Synonym(s):
- Blossary:
- Industry/Domain: Business services
- Category: Project management
- Company: WSDOT
- Product:
- Acronym-Abbreviation:
Other Languages:
Member comments
Terms in the News
Featured Terms
Industry/Domain: Biology Category: Marine biology
Danionella dracula
a new species of fish discovered in the Mekong River region in 2009. The Dracula fish is so named because it has two fangs at the front of its top ...
Contributor
Featured blossaries
Nicholas Stacey
0
Terms
1
Blossaries
0
Followers
Terminologie et Mondialisation
Category: Education 1 3 Terms
Browers Terms By Category
- Radiology equipment(1356)
- OBGYN equipment(397)
- Cardiac supplies(297)
- Clinical trials(199)
- Ultrasonic & optical equipment(61)
- Physical therapy equipment(42)
Medical devices(2427) Terms
- General Finance(7677)
- Funds(1299)
- Commodity exchange(874)
- Private equity(515)
- Accountancy(421)
- Real estate investment(192)
Financial services(11765) Terms
- Architecture(556)
- Interior design(194)
- Graphic design(194)
- Landscape design(94)
- Industrial design(20)
- Application design(17)
Design(1075) Terms
- Clock(712)
- Calendar(26)
Chronometry(738) Terms
- Social media(480)
- Internet(195)
- Search engines(29)
- Online games(22)
- Ecommerce(21)
- SEO(8)